01
We open it up before we quote the finish.
Rot hides under shingles, siding and paint. The first day on any JaxWood job is spent finding out what is actually holding the house up — and photographing it, so you see the same thing we do.
- Full tear-off and haul-away
- Moisture and rot inspection
- Documented before it gets covered
02
Bad wood comes out. It does not get covered.
Rafters, joists, subfloor, decking and load-bearing walls. Anything soft is cut back to sound material and replaced to code before a single layer goes back over it.
- Rafters, joists and decking
- Sistered and reinforced framing
- Built back to code
03
North Florida weather decides how long a roof lasts.
Underlayment, flashing, drip edge, valleys and penetrations go down in order and get checked before the next layer covers them. Heat, salt air and August storms are the standard we build against.
- Synthetic underlayment and flashing
- Shingle and metal roofing
- Sealed at every penetration
04
The part you actually live with.
Screen enclosures, decks, pergolas, drywall, trim and paint. This is where the job stops being a construction site and turns back into your house — and it is the stage most crews rush.
- Screen enclosures and lanais
- Decks, porches and pergolas
- Drywall, trim and paint